Dormer leadwork, flat roofs and a porch re-roof in Ormskirk

OUR WORK · RUFF LANE, ORMSKIRK · SEPTEMBER–OCTOBER 2026

This project on Ruff Lane brought together renewed lead covering to the dormer cheeks, two flat roofs, guttering, and a porch re-roof in small tiles with new leadwork. The dormer work came first, followed by the porch in October.

Our photographs show the preparation and progress as well as the finished work. The final porch image is a still from our completion video on 9 October.

Dormer cheeks: before and after the new leadwork

The earlier photographs show the dormer cheeks opened up, exposing the timber beneath the old covering. We renewed the lead to the cheeks—the sides of the dormers—and carried out the associated flat-roof and gutter work.

Exposed dormer cheek timber before new lead covering at Ruff Lane, Ormskirk
Before the new lead: the dormer cheeks opened up, 21 September.
Renewed lead covering on the dormer cheeks with black guttering at the Ormskirk property
After the lead renewal: the dormer cheeks and guttering, 29 September.

Two flat roofs and guttering

The work also covered two flat roofs and the guttering. These photographs show an earlier roof surface and the renewed mineral-surfaced covering and edge detail during the work. Tools and offcuts are still visible in the progress photograph.

Earlier flat-roof covering and dormer junction at Ruff Lane
An earlier view of the flat roof and adjoining dormer, 17 September.
New mineral-surfaced flat roofing and black roof-edge trim during the Ormskirk job
Flat-roof renewal in progress, 29 September; this is a working-stage photograph.

Porch re-roof: preparation, tiling and finished leadwork

We re-roofed the porch in small tiles and renewed the leadwork. The 6 October photograph shows the membrane and battens before the new covering was laid. The next day's photograph shows the tile courses being built up across the slope, with part of the roof still to finish.

Porch roof with membrane and new battens before retiling in Ormskirk
Before retiling, 6 October: membrane and battens after stripping the old covering.
Small red tiles being laid on the porch roof with a section of battens still exposed
During retiling, 7 October: the small-tile covering taking shape; work is still in progress.

The completion video recorded on 9 October shows the tiled porch being rinsed down. The still below shows the small-tile finish and new stepped lead flashing where the roof meets the brick wall.

Finished small-tile porch covering and stepped lead flashing at the brick wall
Finished porch covering and stepped leadwork: a still from the 9 October completion video, viewed through the scaffold.

The completed scope

  • Renewed lead covering to the dormer cheeks.
  • Work to two flat roofs and the guttering.
  • A porch re-roof in small tiles, with new leadwork.

This report covers the September–October roofing work. The earlier chimney removal and valley reconstruction on Ruff Lane is documented separately.

Planning similar work?

Send us your postcode, a short description and any photographs you have. We can discuss the work and arrange a site inspection where needed. Explore our roofing services in Ormskirk and flat-roof replacement service, or browse more completed projects.

START WITH WHAT YOU KNOW

A roof plan.
A clearer next step.

A few straightforward questions. You can leave the technical details to us.

No measurements needed to start. No obligation to book.

Call us0800 433 2215